High Risk Work Permits

High-risk work, controlled to the minute.

Digital permits for high-risk work, each applied for with its Safe Work Method Statement, checked against the job by Allie and authorised by your team. Every permit is held to its validity window, keys are released only while it's valid, and it's closed out so nothing stays open.

See how it works
A hot work permit live on site: Allie's review, authorised by the facility manager, and activated by the worker after the pre-start checks
Allie on Work PermitsReview on by default; autonomy is yours to set

Every permit checked against the job, around the clock.

  • Suggests the permits a new job needs, with the words in the job that call for each
  • Reviews every submitted permit against its work order and SWMS
  • Flags a SWMS written for different work, answers that don't agree and dates that don't fit
  • Minor gaps and concerns always wait for a person
How Allie works
Hot Work permit · The Mason
Nothing in the SWMS addresses hot workSerious
No photo of the work areaInfo
VerdictSignificant concerns
One thing to fix before this can be approved
Before the work

Applied for, checked and authorised before anyone arrives.

When a job needs a permit, the contractor is asked to apply as the work order goes out, and can also apply at check-in. The application takes the permit's scope, hazards and checks, with a six-section SWMS created in the app, picked from the contractor's library or uploaded. Allie checks both against the job and gives a verdict. Your team authorises it, or sends it back with a comment.

  • Requested as the work order goes out
  • Six-section SWMS with every permit
  • Checked against the job by Allie
  • Authorised or sent back by your team

AccesslyOSAsks the contractor to apply before the day.

Electrical Isolation / LOTO · Mascot DepotMax 8h
ContractorEco Air
WorkReplace main switch on DB-2
Application—
SWMS—
Allie's review—
Authorise
AccesslyOS · ApplicationSent with the work order
Scope and hazards14 questions
Checks to confirm now7 checks
Permit windowNo longer than 8 hours
On the phone

Built on the worker's phone. Reviewed on yours.

The worker opens the permit request from the job and builds the SWMS in the app, one section at a time, with their crew ticked in. Before it reaches you, Allie checks it against the permit and the work order. On this hot work permit the SWMS covers the welding but not the grinding the permit declares, and the work order is for a different job. Each finding opens to its reasoning, and you authorise or send it back from wherever you are.

  • SWMS built step by step on site
  • Allie's findings, each with its severity
  • Each finding opens to its reasoning
  • Authorise or send back from your phone
A worker building the SWMS for a hot work permit on a phone, all six sections complete
The worker
The facility manager reviewing the permit on a phone: Allie found the SWMS leaves out the grinding the permit declares, and the work order is for a different job
Your team
On the day

No valid permit, no key. Nothing left open.

A permit gates the work. At check-in, the visit is checked against the permits its work order and keys call for, and anything missing is applied for before going further. A key restricted to a permit type is released only to someone holding that permit, authorised and inside its window. The crew confirms the pre-start checks at the work face, which is what makes the permit active. It's closed at check-out, or automatically once its window has passed.

  • Permits checked at check-in
  • Keys released only on a valid permit
  • Pre-start checks confirmed on site
  • Closed at check-out, or when the window ends

AccesslyOSChecks the visit against its permits at check-in.

Electrical Isolation / LOTO · Mascot Depot7 Nov 2026
ContractorEco Air
Valid7:00 am to 3:00 pm
Check-in—
Key—
On site—
Close-out—
Closed, with its PDF on the record
AccesslyOS · Check-inCleared
Permits the work order needs1
Electrical Isolation / LOTOAuthorised
OutstandingNone
Out of the box

Fourteen permit types, ready to issue.

Working at heights, hot work, confined space entry, electrical isolation, asbestos, demolition and eight more come built in, so there's nothing to set up. Each type has its own scope and hazard questions, the checks confirmed when it's requested and those confirmed on site, a closure checklist, a maximum validity from 4 to 24 hours, and the regulations, standards and codes of practice behind it.

  • Scope and hazard questions for each type
  • Checks at request, on site and at closure
  • Maximum validity, from 4 to 24 hours
  • Regulations and standards referenced
The 14 work permit templates, with Working at Heights opened to its maximum validity, questions, on-site checks and references

Permit-to-work, properly enforced.

Fourteen permit types
Working at Heights, Roof Access, Confined Space, Excavation, Hot Work, Electrical Isolation/LOTO, Asbestos, Traffic Management and six more, each with the regulations, standards and codes of practice it works to.
Coupled 6-section SWMS
A Safe Work Method Statement required 1:1 with every permit; approval or rejection cascades to both as one package.
Time-boxed validity
Every permit type has a maximum validity: a tight 4 hours for Hot Work, 8 to 12 for most others. A permit can't be submitted for longer.
Permit-gated key access
Keys can be restricted to a permit activity — the fall-arrest kit only releases to someone with an approved Working-at-Heights permit.
Check-in safety net
A 'doing high-risk works?' self-declaration at check-in routes anyone who slipped through into the activity checklist and SWMS before they start.
Auto-expiry
A daily sweep closes approved permits and rejects un-actioned ones once their window passes — so stale permits never linger.

Take control of high-risk work.

See how Accessly enforces permit-to-work from the gate through approval to key access — with a full audit trail.