High-risk work, controlled to the minute.
Digital permits across the eight Australian high-risk-work categories — each paired 1:1 with a Safe Work Method Statement, enforced by time-boxed validity and permit-gated key access, issued at the gate or before arrival, and auto-expired so nothing stays open.

Eight high-risk permits, ready to issue.
Every Australian high-risk-work category is pre-built and ready to go — no setup required. Each permit type is anchored to its WHS regulation and Australian Standard, with the scope fields, hazard prompts, validity window and closure checklist already defined.
- Working at Heights
- Roof Access
- Confined Space Entry
- Excavation & Penetration
- Hot Work
- Electrical Isolation / LOTO
- Asbestos Removal
- Traffic Management

Submit before arrival, or at check-in.
Contractors complete the permit through an interactive application wizard — either ahead of time before they arrive, or during check-in at the gate. Requests can be sent in advance, on their own or bundled automatically with the work order, so the FM can review and approve before anyone sets foot on site.
- Interactive permit application wizard
- Submit before arrival or at check-in
- Requests sent ahead with the work order
- FM reviews and approves

Compliant SWMS attached to every work permit.
Every permit is paired 1:1 with a Safe Work Method Statement. A guided wizard walks the contractor through it section by section — activity, hazards, controls via the hierarchy of controls, and sign-off — and produces a clean, downloadable PDF. Contractors can reuse their company's pre-approved SWMS to skip re-drafting.
- Six-section SWMS, required 1:1
- Guided, step-by-step wizard
- Hierarchy of controls built in
- Downloadable PDF output

One linked record, approved and audit-ready.
Once the FM approves, the permit and its SWMS are fused into a single connected record — viewable in the app and downloadable as an audit-ready PDF. Every approval, validity window and sign-off is captured, so you've always got the evidence on hand.
- SWMS + permit linked as one record
- FM approval captured
- Audit-ready PDF download
- Full validity & sign-off trail

No approved permit, no access.
A permit isn't paperwork you file — it gates the work. Check-in and key release can be blocked until the permit is approved, and permits link to work orders as a conditional requirement for key access. High-risk work simply can't start without the approved permit behind it.
- Check-in blocked pending approval
- Keys gated to the approved permit
- Linked to work orders as a condition
- Work can't start without it

Permit-to-work, properly enforced.
Take control of high-risk work.
See how Accessly enforces permit-to-work from the gate through approval to key access — with a full audit trail.