Safety on Site

Site safety, from QR to risk register.

One on-site safety surface: anyone on site can flag a problem from a QR code in seconds, behind a full hazard, risk and dangerous-goods system — a 5×5 risk matrix, the hierarchy of controls, and a GHS-classified SDS register, all feeding one workflow.

See how it works
A controlled hazard: its risk before and after controls, and each control on the hierarchy
Allie on SafetyMost actions wait for you

No hazard left sitting unanswered.

  • Reads every reported issue for whether it could hurt someone, and drafts the work order for your approval
  • Emails the site's managers when a safety report has had nothing raised for two business hours
  • Flags the same fault reported twice in 30 days with no job raised
  • Raises hazards and keeps the chemical register when you ask. Most changes wait for you
How Allie works
Morning email · site managers
Bin room door won't lock, Harbour City5 reports
Job on any of themNone
Reply “one job”Allie raises it
Flagged for chasing
Triage

Every report read and drafted before you open it.

Allie reads each report as it lands: whether it could hurt someone, what the fault is and whether it's been reported before. A work order is drafted with the photos attached and held for you, and nothing goes to a contractor until you say so. If a safety report still has nothing raised two business hours later, Allie emails the site's managers. You decide what it becomes: a work order, a hazard, a risk, or nothing.

  • Read for whether it could hurt someone
  • Work order drafted, held for approval
  • Site managers emailed after 2 business hours
  • Becomes a work order, hazard or risk

AllieReads the report for whether it could hurt someone.

Reported issue · Harbour CityNew
Loose handrail on the fire stairProperty QR code
WhereLevel 1 to 2 landing · 1 photo
Allie's read—
Work order—
Follow-up—
Work orderHazardRiskDismiss
Allie · The reportRead
Could it hurt someone?Yes, a fall on the stair
The faultFire stair handrail loose
Reported in the last 30 daysNo
QR reporting

Anyone on site can flag a problem in seconds.

A QR code for each property opens a short form on any phone, with no login and no app. Pick the type of issue, describe it, say where it is and add up to six photos. Leaving a name is optional. The report lands in Reported Issues against the right property, with a count of what's still new so nothing is missed.

  • A QR code for each property
  • No login, no app
  • Type, description, location & photos
  • New reports counted until they're opened
A QR hazard report on a phone
Hazards

Score a hazard once. The serious ones escalate themselves.

Score each hazard on the 5×5 matrix as it stands. Anything High or Extreme opens a risk on the register automatically, linked back to the hazard. Add controls from the top of the hierarchy down, from elimination to PPE, then score what's left. A hazard can't be marked controlled until a control is in place and every corrective action is dealt with.

  • 12 hazard types
  • High & Extreme hazards open a risk
  • Five-level hierarchy of controls
  • Uncontrolled & residual scores

YouScore the hazard as it stands, before any controls.

Confined space access without entry permitHazard
TypeConfined Space
PropertyThe Annex
Uncontrolled—
Risk register—
Residual—
Mark as Controlled
You · Uncontrolled risk5×5 matrix
LikelihoodLikely
ConsequenceMajor
Score16 · High
Risk register

Track, score and mitigate every risk.

Every risk is scored on a 5×5 likelihood × consequence matrix, from 1 to 25, as Low, Medium, High or Extreme, with its inherent and residual ratings side by side. Give it an owner, record the controls in place and the treatments still to do, and link a treatment to its work order. Set how often it's reviewed, and anything overdue for review is flagged on the register.

  • 5×5 matrix, scored 1–25
  • Inherent & residual, side by side
  • Treatments linked to work orders
  • Review cadences with overdue flags
A risk on the register: inherent and residual ratings on the 5×5 matrix, with its controls
Dangerous goods

Every substance, GHS-classified.

A property-scoped hazardous-substances register (per WHS Reg 346) with full nine-code GHS classification — pictograms, signal word, H/P codes — storage locations and first-aid info. Build an SDS four ways: upload, in-app wizard, QR-scan the product label, or fetch from a URL — with expiry tracking and 60-day warnings.

  • Property-scoped per WHS Reg 346
  • Full 9-code GHS classification
  • Four SDS creation paths
  • 5-year expiry tracking + 60-day warnings
The hazardous substances register with safety data sheets

Everything that keeps your sites safe.

QR issue reporting
A per-property QR code opens a public form — no login — where anyone on site reports a hazard or issue with photos. The FM triages each into a work order, hazard or risk.
Hazard register
Twelve hazard types, a five-tier hierarchy of controls, uncontrolled-vs-residual scoring and SLA tracking — High/Extreme hazards auto-create a risk.
5×5 risk register
A likelihood × consequence matrix scoring 1–25 into Low/Medium/High/Extreme, with controls, treatments linkable to work orders, and review cadences.
Hazardous substances + SDS
A property-scoped register with full GHS classification, storage and first-aid info — build an SDS four ways, with 5-year expiry tracking and 60-day warnings.
Auto-escalation
Serious hazards escalate into the risk register immediately, so critical exposures never sit unmanaged.
On-site flags
The visit log badges active high-risk works and hazardous substances, so you can see at a glance what's happening on site.

Make every site a safe site.

See how Accessly turns on-site reporting into controlled hazards, scored risks and a compliant SDS register.